LDRX back in operation

18/02/2020 16:30

The LDRX diffractometer returned to operation after replacing the X-ray tube and the control computer. New items will be installed in March 2020 and it is expected to have all the functionality of the equipment (including the control system) available after this stage of the project “Reativa LDRX-UFSC” (Financing FINEP).

New LDRX order submission system will be live soon!